# Production
 
# Production
 
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
 
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx Casey's list]
+
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list]
 
# Electronics: update (Fernando) [http://argus.phys.uregina.ca/gluex/DocDB/0015/001567/001/FDC%20PCB%20QA.pdf doc1567]
 
# Electronics: update (Fernando) [http://argus.phys.uregina.ca/gluex/DocDB/0015/001567/001/FDC%20PCB%20QA.pdf doc1567]
 
# Engineering
 
# Engineering

Revision as of 17:54, 17 August 2010

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics: update (Fernando) doc1567
  3. Engineering
    • Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
    • Mylar window thickness
    • Wire stringing update (Bill)
  4. Full-scale prototype tests [FDC Log Book, pages 509-512]
    • oxygen contamination measurements (Beni)
    • cosmic test update (Beni)
    • wire resolution results
  5. Other: FDC paper