Difference between revisions of "Minutes-8-19-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
 
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
 
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list]
 
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list]
# Electronics: update (Fernando) [http://argus.phys.uregina.ca/gluex/DocDB/0015/001567/001/FDC%20PCB%20QA.pdf doc1567]
+
# Electronics: update (Fernando)
 
# Engineering
 
# Engineering
#* Cathode foil: flex soldering/gluing, procurement status (Roger) [[http://solutions.3m.com/wps/portal/3M/en_US/electronics/home/productsandservices/products/ProductNavigator/TapeAdhesives/?PC_7_RJH9U5230GE3E02LECIE20KHO6_nid=R1DP54D6BCbeG7W0C8BLTFgl 3M conductive film]]
+
#* Cathode foil: procurement status (Roger)
#* Mylar window thickness
+
 
#* Wire stringing update (Bill)
 
#* Wire stringing update (Bill)
 
# Full-scale prototype tests [[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 509-512]]
 
# Full-scale prototype tests [[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 509-512]]

Revision as of 17:56, 17 August 2010

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics: update (Fernando)
  3. Engineering
    • Cathode foil: procurement status (Roger)
    • Wire stringing update (Bill)
  4. Full-scale prototype tests [FDC Log Book, pages 509-512]
    • oxygen contamination measurements (Beni)
    • cosmic test update (Beni)
    • wire resolution results
  5. Other: FDC paper