Difference between revisions of "Minutes-8-19-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
 
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
 
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list]
 
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list]
# Electronics: update (Fernando)
+
# Electronics: update (Fernando) [http://www.jlab.org/Hall-D/detector/fdc/documents/PD_14_Sole_Source_Justification.docx form],  [http://www.jlab.org/Hall-D/detector/fdc/documents/PCB_PR294196_Flood-Sole_Source_Questions_8-11-10.docx PR 294196 questions]
 
# Engineering
 
# Engineering
#* Cathode foil: procurement status (Roger)
+
#* Cathode foil: procurement status (Roger)  
 
#* Wire stringing update (Bill)
 
#* Wire stringing update (Bill)
 
# Full-scale prototype tests: update (Beni)
 
# Full-scale prototype tests: update (Beni)

Revision as of 18:15, 17 August 2010

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics: update (Fernando) form, PR 294196 questions
  3. Engineering
    • Cathode foil: procurement status (Roger)
    • Wire stringing update (Bill)
  4. Full-scale prototype tests: update (Beni)
  5. Other: talks at the collaboration meeting