Difference between revisions of "Minutes-8-19-2010"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
  
 
# Production
 
# Production
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
+
#* Clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions]
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list]
+
#* Equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list]
 +
#* Defect possibilities [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Defect_Possibilities.docx  Mark&Casey's list]
 
# Electronics (Fernando)
 
# Electronics (Fernando)
 
#* update on first article PCBs
 
#* update on first article PCBs
Line 12: Line 13:
 
#* Cathode foil: sole source procurement status (Roger) [http://www.jlab.org/Hall-D/detector/fdc/documents/PD_14_Sole_Source_Justification.docx form],  [http://www.jlab.org/Hall-D/detector/fdc/documents/PCB_PR294196_Flood-Sole_Source_Questions_8-11-10.docx PR 294196 questions]
 
#* Cathode foil: sole source procurement status (Roger) [http://www.jlab.org/Hall-D/detector/fdc/documents/PD_14_Sole_Source_Justification.docx form],  [http://www.jlab.org/Hall-D/detector/fdc/documents/PCB_PR294196_Flood-Sole_Source_Questions_8-11-10.docx PR 294196 questions]
 
#* Wire stringing update (Bill)
 
#* Wire stringing update (Bill)
#* Other: granite tables, update from UVA
+
#* Other: granite tables, update from UVA, returning the tent in 126 to HallA
 
# Full-scale prototype tests: update (Beni)
 
# Full-scale prototype tests: update (Beni)
 
# Other: talks at the collaboration meeting
 
# Other: talks at the collaboration meeting

Revision as of 12:32, 18 August 2010

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics (Fernando)
    • update on first article PCBs
    • other
  3. Engineering
    • Cathode foil: sole source procurement status (Roger) form, PR 294196 questions
    • Wire stringing update (Bill)
    • Other: granite tables, update from UVA, returning the tent in 126 to HallA
  4. Full-scale prototype tests: update (Beni)
  5. Other: talks at the collaboration meeting