Minutes-8-19-2010

From GlueXWiki
Revision as of 17:56, 17 August 2010 by Pentchev (Talk | contribs)

Jump to: navigation, search

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics: update (Fernando)
  3. Engineering
    • Cathode foil: procurement status (Roger)
    • Wire stringing update (Bill)
  4. Full-scale prototype tests [FDC Log Book, pages 509-512]
    • oxygen contamination measurements (Beni)
    • cosmic test update (Beni)
    • wire resolution results
  5. Other: FDC paper