Difference between revisions of "Minutes-8-22-2013"

From GlueXWiki
Jump to: navigation, search
 
(5 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
# Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf]
 
# Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf]
 
#* Mechanical: infrastructure, survey, cooling system, AC
 
#* Mechanical: infrastructure, survey, cooling system, AC
 +
#* Electronics: crates, modules, LV, HV
 
#* Gas system
 
#* Gas system
 
#* Controls: LV, HV, gas
 
#* Controls: LV, HV, gas
Line 12: Line 13:
 
# Other
 
# Other
  
<!--
 
  
 
= Minutes =
 
= Minutes =
  
Participants: Eugene, Bill, Nick, Simon, Vlad, Dave, Beni, Glenn, and Lubomir.
+
Participants: Bill, Chris, Nick, Simon, Vlad, Beni, Glenn, and Lubomir.
  
== Production ==
+
== Installation preparations ==
  
- On Wednesday (8/14) we moved the FDC from Blue Crab to EEl126 (see pictures attached). We installed tires on the cart at 30psi that worked as a cushion. Dave: had problems with the truck this morning that delayed the moving; still thinks will finish by Friday. If not, some stuff can be left at Blue Crab close to the doors to be moved on Monday. Eugene suggested to move the two granite tables left at Blue Crab (one went to Brian Cross) to the ESB temporary and then try to occupy some of "our space" in the TEDF or Test Lab. Tom is providing help for the transportation.
+
- We are done with the production and will continue discussing the installation. We went through the installation document linked above, where the installation topics are grouped in different categories, as in the agenda.
  
- End of last week we finished the cabling dry run: 1/4 of the signal cables were installed (see pictures attached). The additional rails for the mesh are causing some problems for the installation and service of the chambers being very close to the pre-amps and connectors. Especially, due to the four additional rails on the sides the density of the cables between the rails is very high so that it is difficult to work on the pre-amps behind them. It turned out that the axis of the mesh for this exercise was shifted with respect to the FDC axis and we had more space at the side where we did the cabling than we are supposed to. Other than that and the finding that we need more cuts on the skin for cable attachment, everything was successful and the dry run demonstrated that the current cabling scheme will work.
+
- Mechanical. Bill explained the way the detector rails will be installed: first in BCAL adjusting the two main rails to the nominal distance. Then the rails of the front installation cart will be adjusted and attached, and so on. The survey people will need space around the FDC and Bill was considering the possibility to remove the electronics racks. We think this should be done if absolutely necessary since the racks will be installed, powered, connected to ground, and this will delay the installation.  
  
== Engineering ==
+
- Electronics. According to Nick and Chris, most likely the modules will be tested in the crates and then the crates with the modules together installed in the racks, as in the original plan. This worked already for the FCAL, they just had to remove the power supplies while installing the crates. The LV and HV system will be installed in advance before the start of the FDC installation. They will be needed for testing.
  
- We discussed the possibility to remove the four extra rails on the sides and to use the two main rails (for the detectors) to attach the mesh on the sides. We still need the top and bottom rails for the mesh. Bill: this is possible and will work on that. We need to make the upstream mesh bearing removable so that the CDC can be inserted inside the mesh. Bill thinks using the same rails for the detector and the mesh will not be a problem with respect to possible deformations.  
+
- Gas system. It's in production now. Some elements have been bought already. If the gas system is not ready when we start the installation, we will have to find a temporary solution: a dewar with Nitrogen, or better gas mixture.  
  
- Bill showed several drawings (linked above) explaining the attachment of the pulling straps to the FDC bearings and the mesh: using plates and additional strap on the mesh. The same plates will be used to attach the grounding cables.  
+
- Controls. Some minimal control will be needed during the installation. Dave will work on the codes for the chiller, and the gas system.  
  
- Results of the FDC survey at Blue Crab are linked above. Four fiducials per package were installed but not spaced exactly by 90deg (+/-15). The package positions were adjusted (up-down, left-right) in order to have <0.5mm offset from the ideal position in X and Y. In Z we have deviations from the vertical position up to 0.75mm, but we could not estimate right away what fraction of the deviation is due to a tilt and what due to a deformation. For that, survey people were supposed to do flatness measurements, but they didn't. The final survey will be done in the Hall on the platform before the cabling. We all agreed it is not worth doing one more survey in the EEL.  
+
- Testing. While connecting signal cables to the detector, we will test them by applying LV on the cards. For that we need the LV cables to be connected to the LV panels. After connecting all the cables to the detector we probably hav to disconnect the LV cables and re-route them, but this is to be seen. For the final testing we will use scintillators on the top and the bottom of the installation cart for triggering. We can try this in 126. Beni: for the DAQ there will be no problems to read 7 crates, what is needed for the test of one package.  
  
- We discussed how the rails inside BCAL will be installed and how they will be adjusted to the rails on the three carts. Working inside BCAL to install/adjust the rails will not be easy, but there's no way around it. The carts as installed on the platform rails will be movable in all direction, so as soon as the distance between the main rails is OK (it has be adjusted/surveyed at Blue Crab) it will not be a problem. The mesh rails don't have to be adjusted very precisely.
+
== Engineering ==
 +
 
 +
- Bill is working on the attachment to support the mesh, that is needed to avoid the four extra rails.  
  
 
== Electronics ==
 
== Electronics ==
  
- Nick fixed the 5 connectors on the signal cables. Thus the flat part on these cables gets shorter and Bill suggested connecting them to the pre-amps that don't require bending of the cable.  
+
- Half of the signal cables have been labeled by the students. In fact, the plan was to label them as we connect them, but as soon as they are sorted by labels this is OK. The other half of the cable we may leave unlabeled, or label and sort them if there's time and people to do this. As for the LV cables all they have to be labeled, so far 3/4 are done.  
  
 
== Tests at EEL126 ==
 
== Tests at EEL126 ==
  
- The FDC was connected to the gas Ar/CO2 40/60 at 100ccpm. The packages were connected in series i.e. there's some pressure change from the first to the last package. We have four independent bubblers (one per package) that are all bubbling. The pressure is 30-50Pa. The plan is to apply HV to all the packages and make sure all the HV channels are working.
+
- The FDC packages are being flushed with gas, all four bubbling at 100ccpm total. Next week we will do the final test just by applying HV to each package.
 
+
- The spare package was connected to the Oxygen sensor showing 300ppm as of Thursday and 230ppm on the next day. The flow was increased from 50 to 220ccpm. There's more work on the signal/LV cabling and on the grounding to be done before we start testing the spare package with DAQ.
+
 
+
- Beni and Eugene discussed the possible fADC125 algorithms, a continuation from the tracking meeting.
+
  
-->
+
- We are testing now the spare package. Vlad did the grounding, signal and LV and HV connections to the top two cells. The max drift time for these cells is ~20usec and Beni made the corresponding corrections in the DAQ. He can read few thousand samples from the fADCs without a problem, but the event builder crashes above some event size when reading many modules.

Latest revision as of 14:23, 23 August 2013

August 22, 2013 FDC meeting

Agenda

  1. Installation preparations [1]
    • Mechanical: infrastructure, survey, cooling system, AC
    • Electronics: crates, modules, LV, HV
    • Gas system
    • Controls: LV, HV, gas
    • Testing: cables, trigger, DAQ
  2. Engineering (Bill)
  3. Electronics (Chris, Nick)
  4. Tests at EEL126 (Beni)
  5. Other


Minutes

Participants: Bill, Chris, Nick, Simon, Vlad, Beni, Glenn, and Lubomir.

Installation preparations

- We are done with the production and will continue discussing the installation. We went through the installation document linked above, where the installation topics are grouped in different categories, as in the agenda.

- Mechanical. Bill explained the way the detector rails will be installed: first in BCAL adjusting the two main rails to the nominal distance. Then the rails of the front installation cart will be adjusted and attached, and so on. The survey people will need space around the FDC and Bill was considering the possibility to remove the electronics racks. We think this should be done if absolutely necessary since the racks will be installed, powered, connected to ground, and this will delay the installation.

- Electronics. According to Nick and Chris, most likely the modules will be tested in the crates and then the crates with the modules together installed in the racks, as in the original plan. This worked already for the FCAL, they just had to remove the power supplies while installing the crates. The LV and HV system will be installed in advance before the start of the FDC installation. They will be needed for testing.

- Gas system. It's in production now. Some elements have been bought already. If the gas system is not ready when we start the installation, we will have to find a temporary solution: a dewar with Nitrogen, or better gas mixture.

- Controls. Some minimal control will be needed during the installation. Dave will work on the codes for the chiller, and the gas system.

- Testing. While connecting signal cables to the detector, we will test them by applying LV on the cards. For that we need the LV cables to be connected to the LV panels. After connecting all the cables to the detector we probably hav to disconnect the LV cables and re-route them, but this is to be seen. For the final testing we will use scintillators on the top and the bottom of the installation cart for triggering. We can try this in 126. Beni: for the DAQ there will be no problems to read 7 crates, what is needed for the test of one package.

Engineering

- Bill is working on the attachment to support the mesh, that is needed to avoid the four extra rails.

Electronics

- Half of the signal cables have been labeled by the students. In fact, the plan was to label them as we connect them, but as soon as they are sorted by labels this is OK. The other half of the cable we may leave unlabeled, or label and sort them if there's time and people to do this. As for the LV cables all they have to be labeled, so far 3/4 are done.

Tests at EEL126

- The FDC packages are being flushed with gas, all four bubbling at 100ccpm total. Next week we will do the final test just by applying HV to each package.

- We are testing now the spare package. Vlad did the grounding, signal and LV and HV connections to the top two cells. The max drift time for these cells is ~20usec and Beni made the corresponding corrections in the DAQ. He can read few thousand samples from the fADCs without a problem, but the event builder crashes above some event size when reading many modules.