Difference between revisions of "Minutes-8-28-2014"

From GlueXWiki
Jump to: navigation, search
Line 28: Line 28:
 
== CDC update ==
 
== CDC update ==
  
- Fernado: working with Nick on the CDC noise from the CAEN supply. Contacted CAEN people: they are trying to be helpful. Grounding of the aluminum ring didn't help. They found two HVBs next to each other, one (C5) is very clean while the other (C6) has huge noise varying from channel to channel. Will use them to troubleshoot the noise. The swapping of HV connectors, or moving HV wires didn't change anything. Tomorrow will continue with  
+
- Fernado: working with Nick on the CDC noise from the CAEN supply. Contacted CAEN people: they are trying to be helpful. Grounding of the aluminum ring didn't help. They found two HVBs next to each other, one (C5) is very clean while the other (C6) has huge noise varying from channel to channel. Will use them to troubleshoot the noise. The swapping of HV connectors, or moving HV wires didn't change anything. Tomorrow will continue with "swapping everything" to find the problem.
 
+
<!--
+
  
 
== FDC update ==
 
== FDC update ==
  
- Lubomir: by applying timing cuts on the hits from the two cathodes and the wires in a cell, one can reduce the threshold down to 50 fADC units (~4mV). As a result we see now most of the "missing" cathode channels, that have problems with the conductive tape. Of course the resolution will be deteriorated but one can still use this information for the pattern recognition. Couple of interesting events are linked above.
+
- Lubomir: FDC not operational right now (see chiller problems below). Vlad is comparing the results of the runs before/during/after the magnet test, will report on the next meeting. One TDC channel stopped working. With a scope we see all the channels. Fernando: swap the two signal cables and if the problem is in the same channel to contact Ed.
  
 
== Engineering ==
 
== Engineering ==
 +
<!--
  
 
- Bill: problems with the chiller on Monday, it was not regulating the temperature. Tom adjusted the thermostatic valve and it started regulating again. Bill discussed with the company the chiller problems. They say the thermostatic valve must be OK, but the new compressor installed is not quite the same as the original one. They don't have spare units and they don't make visits to fix the chiller. If the problems continue, either we have to swap the compressor, or send the chiller to Indiana for repair, or get a new one from Japan.  The plan for now is to install the heat exchanger (maybe tomorrow) and continue monitoring.
 
- Bill: problems with the chiller on Monday, it was not regulating the temperature. Tom adjusted the thermostatic valve and it started regulating again. Bill discussed with the company the chiller problems. They say the thermostatic valve must be OK, but the new compressor installed is not quite the same as the original one. They don't have spare units and they don't make visits to fix the chiller. If the problems continue, either we have to swap the compressor, or send the chiller to Indiana for repair, or get a new one from Japan.  The plan for now is to install the heat exchanger (maybe tomorrow) and continue monitoring.

Revision as of 18:15, 28 August 2014

August 28, 2014 FDC+CDC meeting

Agenda

  1. DAQ (Beni)
  2. CDC status (Mike, Beni)
  3. FDC status (Vlad, Lubomir)
  4. Electronics (Chris, Nick)
  5. Engineering (Bill)
  6. Commissioning Wiki Page (all)
  7. Other

Instructions for Bluejeans meeting connection

FDC meeting ID: 290664653

Minutes

Participants: Curtis, Naomi (CMU), Sean (NU), Beni, Luke, Chris, Nick, Bill, Fernando, and Lubomir (JLab).

DAQ

- Beni: testing the latest fADC125 firmware in ROCFDC2. This version has some fixes that Cody did based on the problems Beni found last week. For these tests needs DAQ with software trigger. ROCFDC3 has problems: works at the beginning but later has no valid data.

- Lubomir: according to Sasha he made a big progress with the GTP using BCAL north side. There are some minor issues but expect soon to have the BCAL up/down coincidence trigger. When it's ready we have to move the CDC/FDC trigger electronics from the bottom to the top trigger crate. The fan on the bottom trigger crate was replaced and there are no more spare fans; not clear what the problem is with these fan units.

CDC update

- Fernado: working with Nick on the CDC noise from the CAEN supply. Contacted CAEN people: they are trying to be helpful. Grounding of the aluminum ring didn't help. They found two HVBs next to each other, one (C5) is very clean while the other (C6) has huge noise varying from channel to channel. Will use them to troubleshoot the noise. The swapping of HV connectors, or moving HV wires didn't change anything. Tomorrow will continue with "swapping everything" to find the problem.

FDC update

- Lubomir: FDC not operational right now (see chiller problems below). Vlad is comparing the results of the runs before/during/after the magnet test, will report on the next meeting. One TDC channel stopped working. With a scope we see all the channels. Fernando: swap the two signal cables and if the problem is in the same channel to contact Ed.

Engineering