Minutes-8-30-2012

From GlueXWiki
Revision as of 12:14, 30 August 2012 by Pentchev (Talk | contribs)

Jump to: navigation, search

August 30, 2012 FDC meeting

Agenda

  1. Cathode production Construction Tracking (Dave)
  2. Cathode corrosion
    • Recent test results: [1]
  3. Conductive tape studies: [2], [3], [4],[5], [6]
  4. Engineering (Bill)
    • Cathode strong-backs
  5. Electronics (Chris, Nick)
    • PCBs
  6. Third package tests FDC E-log (Beni)
  7. TDR, pages 132-145 (Lubomir)
  8. Other