August 30, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Cathode corrosion
    • Recent test results: [1]
  3. Conductive tape studies: [2], [3], [4],[5], [6] (Vlad)
  4. Engineering (Bill)
    • Cathode strong-backs
  5. Electronics (Chris, Nick)
    • PCBs
  6. Third package tests FDC E-log (Beni)
  7. TDR, pages 132-145 (Lubomir)
  8. Other

Minutes

Participants: Fernando, Bill, Dave, Elton, Simon, Chris, Vlad, Beni, and Lubomir

Production

- Dave for: working on all the cathodes for package #1. Using the new tool to hold the cathodes flat, two cathodes moved to tables and the cards are being glued there. Will have cathodes for the first, second, and third cells by next Tuesday, next Thursday, and next next Tuesday respectively. This is assuming one cathode per day, which is limited by the tools that we use now.

- Wire frames: Chris will put the resistors on the first PCB set next week. Then we will start laminating the wire plane #29, we have a frame for it. The other three G10 wire frames will come from the machine shop in ~2 weeks. Fernando and Bill confirmed that the new PCBs can be used.

- Roger got quotations from Allflex and Flexible Circuits, the two Minnesota companies that made the cathode foils and the rigid-flex assemblies. According to Allflex they have material for 18-19 foils and we asked for 20. We will need the foils for some of the cathodes on package #2. Based on Dave's estimations for the refurbishment of the first package and then completion of the fourth one, we will need the foils sometime in November-December. In any case it's better to submit the PR now and contact Eugene to use funds (~$10K) from FY12.

Cathode corrosion

Conductive tape studies

Engineering