Difference between revisions of "Minutes-8-4-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 3: Line 3:
 
= Agenda =
 
= Agenda =
  
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_July28.xlsx Construction Tracking] (Dave)
+
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_August_4_2011.xlsx Construction Tracking] (Dave)
 
#* Status
 
#* Status
 
#* Wire deadening
 
#* Wire deadening

Revision as of 11:55, 5 August 2011

August 4, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Wire deadening
    • Other
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126
    • Cell#1 status (Beni)
    • Testing prototype again (Lubomir)
  5. Other