Difference between revisions of "Minutes-8-5-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 5: Line 5:
 
# Production
 
# Production
 
#* 727 B.C. status
 
#* 727 B.C. status
#* equipment for the production
+
#* equipment/materials needed for the production
 
# Electronics: update (Fernando)
 
# Electronics: update (Fernando)
 
# Engineering
 
# Engineering
#* Cathode foil: soldering, procurement status (Roger)
+
#* Cathode foil: flex soldering/gluing, procurement status (Roger)
 
#* Wire stringing update (Bill)   
 
#* Wire stringing update (Bill)   
 
# Full-scale prototype tests
 
# Full-scale prototype tests

Revision as of 15:22, 4 August 2010

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • equipment/materials needed for the production
  2. Electronics: update (Fernando)
  3. Engineering
    • Cathode foil: flex soldering/gluing, procurement status (Roger)
    • Wire stringing update (Bill)
  4. Full-scale prototype tests
    • oxygen contamination measurements (Beni)
    • cosmic test update (Beni)
    • wire resolution results
  5. Other