Difference between revisions of "Minutes-8-5-2010"
From GlueXWiki
Line 8: | Line 8: | ||
# Electronics: update (Fernando) | # Electronics: update (Fernando) | ||
# Engineering | # Engineering | ||
− | #* Cathode foil: flex soldering/gluing, procurement status (Roger) | + | #* Cathode foil: flex soldering/gluing, procurement status (Roger) [[http://solutions.3m.com/wps/portal/3M/en_US/electronics/home/productsandservices/products/ProductNavigator/TapeAdhesives/?PC_7_RJH9U5230GE3E02LECIE20KHO6_nid=R1DP54D6BCbeG7W0C8BLTFgl 3M conductive film]] |
#* Wire stringing update (Bill) | #* Wire stringing update (Bill) | ||
# Full-scale prototype tests | # Full-scale prototype tests |
Revision as of 09:38, 5 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- equipment/materials needed for the production
- Electronics: update (Fernando)
- Engineering
- Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
- Wire stringing update (Bill)
- Full-scale prototype tests
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other