Difference between revisions of "Minutes-8-5-2010"
From GlueXWiki
Line 5: | Line 5: | ||
# Production | # Production | ||
#* 727 B.C. status | #* 727 B.C. status | ||
− | #* equipment/materials needed for the production | + | #* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/materials.txt Casey's list] |
# Electronics: update (Fernando) | # Electronics: update (Fernando) | ||
# Engineering | # Engineering | ||
Line 11: | Line 11: | ||
#* Mylar window thickness | #* Mylar window thickness | ||
#* Wire stringing update (Bill) | #* Wire stringing update (Bill) | ||
− | # Full-scale prototype tests | + | # Full-scale prototype tests [[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 509-512]] |
#* oxygen contamination measurements (Beni) | #* oxygen contamination measurements (Beni) | ||
#* cosmic test update (Beni) | #* cosmic test update (Beni) |
Revision as of 09:51, 5 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- equipment/materials needed for the production Casey's list
- Electronics: update (Fernando)
- Engineering
- Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
- Mylar window thickness
- Wire stringing update (Bill)
- Full-scale prototype tests [FDC Log Book, pages 509-512]
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other