Difference between revisions of "Minutes-8-5-2010"

From GlueXWiki
Jump to: navigation, search
Line 32: Line 32:
 
== Electronics ==
 
== Electronics ==
  
-  
+
- Fernando
  
 
== Engineering ==
 
== Engineering ==

Revision as of 17:41, 5 August 2010

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • equipment/materials needed for the production Casey's list
  2. Electronics: update (Fernando) doc1567
  3. Engineering
    • Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
    • Mylar window thickness
    • Wire stringing update (Bill)
  4. Full-scale prototype tests [FDC Log Book, pages 509-512]
    • oxygen contamination measurements (Beni)
    • cosmic test update (Beni)
    • wire resolution results
  5. Other