Difference between revisions of "Minutes-8-5-2010"

From GlueXWiki
Jump to: navigation, search
Line 32: Line 32:
 
== Electronics ==
 
== Electronics ==
  
- Fernando  
+
- Fernando reported on the acceptance test of the first article PCBs (see attached document). Overall the quality was good, the PDBs are accepted and the production should continue as scheduled. There were few exceptions, some of them minor, some easily fixable: on some of the boards the vias were not filled as required. One important issue was discussed: the material used in the boards is FR-4, but we required g10. The reason
  
 
== Engineering ==
 
== Engineering ==

Revision as of 18:28, 5 August 2010

August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • equipment/materials needed for the production Casey's list
  2. Electronics: update (Fernando) doc1567
  3. Engineering
    • Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
    • Mylar window thickness
    • Wire stringing update (Bill)
  4. Full-scale prototype tests [FDC Log Book, pages 509-512]
    • oxygen contamination measurements (Beni)
    • cosmic test update (Beni)
    • wire resolution results
  5. Other