August 5, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • equipment/materials needed for the production
  2. Electronics: update (Fernando)
  3. Engineering
    • Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
    • Mylar window thickness
    • Wire stringing update (Bill)
  4. Full-scale prototype tests
    • oxygen contamination measurements (Beni)
    • cosmic test update (Beni)
    • wire resolution results
  5. Other