Minutes-9-1-2011

From GlueXWiki
Revision as of 16:20, 1 September 2011 by Pentchev (Talk | contribs)

Jump to: navigation, search

September 1, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Package configurations
    • First package tests (Lubomir)
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (cell#2) (Beni, Lubomir)
  5. Other