Difference between revisions of "Minutes-9-23-2010"

From GlueXWiki
Jump to: navigation, search
Line 10: Line 10:
 
# Engineering
 
# Engineering
 
#* Cathode foil: sole source procurement status (Fernando)
 
#* Cathode foil: sole source procurement status (Fernando)
#* Wire stringing: status and plans (Bill, David)  
+
#* Wire stringing: status and plans (Bill, David) [[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/dual_axis_developer_kit.pdf]], [[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/FOCUSING_UNIT_DESC.pdf]],[[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/SQL-RV-1.8_MOTOR_SPECS.pdf]]
 
# Full-scale prototype
 
# Full-scale prototype
 
#* test update (Beni)
 
#* test update (Beni)

Revision as of 17:08, 22 September 2010

September 23, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Clean room update
  2. Electronics
    • update (Fernando)
    • discussions of the FDC requirements for the pre-amplifiers and fADC125 [FDC Log Book, pages 516]
  3. Engineering
    • Cathode foil: sole source procurement status (Fernando)
    • Wire stringing: status and plans (Bill, David) [[1]], [[2]],[[3]]
  4. Full-scale prototype
  5. Other