Difference between revisions of "Minutes-9-23-2010"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
# Electronics  
 
# Electronics  
 
#* update (Fernando)
 
#* update (Fernando)
#* discussions of the FDC requirements for the pre-amplifiers and fADC125 [[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 516]]  
+
#* discussions of the FDC requirements for the pre-amplifiers and fADC125 [[http://www.jlab.org/Hall-D/detector/fdc/electronics/FDC_electronics_req.pdf FDC requirements]],[[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 516-517]]  
 
# Engineering
 
# Engineering
 
#* Cathode foil: sole source procurement status (Fernando)
 
#* Cathode foil: sole source procurement status (Fernando)

Revision as of 12:03, 23 September 2010

September 23, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Clean room update
  2. Electronics
  3. Engineering
    • Cathode foil: sole source procurement status (Fernando)
    • Wire stringing: status and plans (Bill, David) [[1]], [[2]],[[3]]
  4. Full-scale prototype
  5. Other