Difference between revisions of "Minutes-9-23-2010"
From GlueXWiki
Line 19: | Line 19: | ||
= Minutes = | = Minutes = | ||
− | Participants: Eugene, Fernando, Beni, Bill, Chris, David, Simon, Gerard (on the phone), and Lubomir | + | Participants: Eugene, Fernando, Beni, Bill, Chris, David, Simon, Gerard (on the phone), and Lubomir. |
It was a long (2.5 hours) but productive meeting, half of the time discussing the FDC requirements for the electronins, and the other half - the wire stringing procedure. | It was a long (2.5 hours) but productive meeting, half of the time discussing the FDC requirements for the electronins, and the other half - the wire stringing procedure. | ||
Line 25: | Line 25: | ||
== Production == | == Production == | ||
− | - Only good news | + | - Only good news about Blue Crab, |
== Electronics == | == Electronics == |
Revision as of 18:18, 23 September 2010
September 23, 2010 FDC meeting
Tentative Agenda
- Production
- Clean room update
- Electronics
- update (Fernando)
- discussions of the FDC requirements for the pre-amplifiers and fADC125 [FDC requirements],[FDC Log Book, pages 516-517]
- Engineering
- Full-scale prototype
- test update (Beni)
- momentum resolution studies [FDC Log Book, pages 515] (Simon)
- Other