Difference between revisions of "Minutes-9-23-2010"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
  
 
= Minutes =
 
= Minutes =
Participants: Eugene, Fernando, Beni, Bill, Chris, David, Simon, Gerard (on the phone), and Lubomir
+
Participants: Eugene, Fernando, Beni, Bill, Chris, David, Simon, Gerard (on the phone), and Lubomir.
  
 
It was a long (2.5 hours) but productive meeting, half of the time discussing the FDC requirements for the electronins, and the other half - the wire stringing procedure.
 
It was a long (2.5 hours) but productive meeting, half of the time discussing the FDC requirements for the electronins, and the other half - the wire stringing procedure.
Line 25: Line 25:
 
== Production ==
 
== Production ==
  
- Only good news  
+
- Only good news about Blue Crab,
  
 
== Electronics ==
 
== Electronics ==

Revision as of 18:18, 23 September 2010

September 23, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Clean room update
  2. Electronics
  3. Engineering
    • Cathode foil: sole source procurement status (Fernando)
    • Wire stringing: status and plans (Bill, David) [[1]], [[2]],[[3]]
  4. Full-scale prototype
  5. Other