== Production ==
 
== Production ==
  
- Only good news about Blue Crab,  
+
- Only good news about Blue Crab, procurement will finalize the contract with AdvanceTEC for the construction of the clean room by the end of the month. The AC for the whole area
 +
is being installed now.
  
 
== Electronics ==
 
== Electronics ==
 +
 +
<!--
  
 
- Fernando prepared two pre-amps in discriminator mode, together with the cables and ECL translator. Beni is testing them. Fernando wants us to answer in one week whether they are acceptable. There's some delay with the delivery of the PCBs. They had to be here on Monday, but will have them next week. The contract for the PCB stuffing is ready submitted to the procurement. Will have the first 2x6 PCBs (1st article) within two weeks and after the approval the rest (26x6) will be done in 4 weeks. We discussed how we will store the PCBs: in boxes, wrapped and taped. Fernando is also working on the procurement of the HV mini cables.
 
- Fernando prepared two pre-amps in discriminator mode, together with the cables and ECL translator. Beni is testing them. Fernando wants us to answer in one week whether they are acceptable. There's some delay with the delivery of the PCBs. They had to be here on Monday, but will have them next week. The contract for the PCB stuffing is ready submitted to the procurement. Will have the first 2x6 PCBs (1st article) within two weeks and after the approval the rest (26x6) will be done in 4 weeks. We discussed how we will store the PCBs: in boxes, wrapped and taped. Fernando is also working on the procurement of the HV mini cables.

Revision as of 18:37, 23 September 2010

September 23, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Clean room update
  2. Electronics
  3. Engineering
    • Cathode foil: sole source procurement status (Fernando)
    • Wire stringing: status and plans (Bill, David) [[1]], [[2]],[[3]]
  4. Full-scale prototype
  5. Other


Minutes

Participants: Eugene, Fernando, Beni, Bill, Chris, David, Simon, Gerard (on the phone), and Lubomir.

It was a long (2.5 hours) but productive meeting, half of the time discussing the FDC requirements for the electronins, and the other half - the wire stringing procedure.

Production

- Only good news about Blue Crab, procurement will finalize the contract with AdvanceTEC for the construction of the clean room by the end of the month. The AC for the whole area is being installed now.

Electronics