Difference between revisions of "Minutes-9-29-2011"
From GlueXWiki
Line 6: | Line 6: | ||
#* Status | #* Status | ||
#* First package tests (Lubomir) | #* First package tests (Lubomir) | ||
− | # Engineering update (Bill) | + | # Engineering update (Bill) |
− | + | ||
# Electronics update (Chris) | # Electronics update (Chris) | ||
# Chamber testing at EEL126 (Beni) | # Chamber testing at EEL126 (Beni) |
Revision as of 17:17, 28 September 2011
September 22, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Status
- First package tests (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- Chamber testing at EEL126 (Beni)
- Other