Minutes-9-29-2011
From GlueXWiki
September 29, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Status
- First package tests (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- Chamber testing at EEL126 (Beni)
- Other
Minutes
Participants: Bill, Dave, Chris, Simon, Beni, Vladimir, and Lubomir.
Production
- Dave: Working on the sixth (last) wire frame for the first package; all wires soldered and today will do tension measurements. The fifth wire frame will be populated tomorrow by Chris. On Monday we will do the wire deadening on that frame and then it will be ready for stacking. Started working on the end windows and first cathode for the package #2.