Difference between revisions of "Minutes-9-30-2010"
From GlueXWiki
Line 7: | Line 7: | ||
#* Discussions of the FDC electronics (cont.) [[http://www.jlab.org/Hall-D/detector/fdc/electronics/FDC_electronics_req.pdf FDC requirements]] | #* Discussions of the FDC electronics (cont.) [[http://www.jlab.org/Hall-D/detector/fdc/electronics/FDC_electronics_req.pdf FDC requirements]] | ||
# Engineering (Bill and David) | # Engineering (Bill and David) | ||
− | #* Wire stringing: fixtures, movement system | + | #* Wire stringing: fixtures, movement system [[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/stringingtable1.JPG]], [[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/stringingtable2.JPG]] |
#* Discussions of the stringing procedure (cont.) | #* Discussions of the stringing procedure (cont.) | ||
#* Other | #* Other |
Revision as of 12:31, 30 September 2010
September 30, 2010 FDC meeting
Tentative Agenda
- Electronics
- Update (Fernando)
- Discussions of the FDC electronics (cont.) [FDC requirements]
- Engineering (Bill and David)
- Full-scale prototype
- tests with different gas mixtures (Beni)
- Other