Difference between revisions of "Minutes-9-30-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 7: Line 7:
 
#* Discussions of the FDC electronics (cont.) [[http://www.jlab.org/Hall-D/detector/fdc/electronics/FDC_electronics_req.pdf FDC requirements]]  
 
#* Discussions of the FDC electronics (cont.) [[http://www.jlab.org/Hall-D/detector/fdc/electronics/FDC_electronics_req.pdf FDC requirements]]  
 
# Engineering (Bill and David)
 
# Engineering (Bill and David)
#* Wire stringing: fixtures, movement system
+
#* Wire stringing: fixtures, movement system [[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/stringingtable1.JPG]], [[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/stringingtable2.JPG]]
 
#* Discussions of the stringing procedure (cont.)
 
#* Discussions of the stringing procedure (cont.)
 
#* Other
 
#* Other

Revision as of 12:31, 30 September 2010

September 30, 2010 FDC meeting

Tentative Agenda

  1. Electronics
    • Update (Fernando)
    • Discussions of the FDC electronics (cont.) [FDC requirements]
  2. Engineering (Bill and David)
    • Wire stringing: fixtures, movement system [[1]], [[2]]
    • Discussions of the stringing procedure (cont.)
    • Other
  3. Full-scale prototype
    • tests with different gas mixtures (Beni)
  4. Other