Minutes 060609
From GlueXWiki
Notes for item 2, tagger and trigger timing, etc:
1. We should install He bags; need official request to H-B for this and other beamline components incl. radiator thickness, collimator size, etc. 2. Tagger trigger timing (thanks to Eugene Pasyuk): 20 ns transit time in PMT's 50 ns cable to CFD 10-15 ns internal CFD 5 ns cable to L-R coincidence module 5 ns internal coincidence module 10 ns cable to Master OR module 20 ns internal Master OR 80 ns cable to forward carriage 3. Photon flight time to alcove approx 100 ns 4. Tagger uses LeCroy 1877 multi-hit and CAEN pipelined TDC's, both run in common-stop mode 5. CAEN V792 ADC (BCAL readout) is slowest and sets front-end busy time. May skip busy and just use front-end-busy-timer in TS, as V792 has fixed digitization time of approx 7 microsec.