Difference between revisions of "Minutes 8-30-2006"

From GlueXWiki
Jump to: navigation, search
m ((30) moved to Minutes 8-30-2006: Reorganization of page)
Line 8: Line 8:
 
-----------------------------------------------------------------------
 
-----------------------------------------------------------------------
  
1). Simon has checked the cosmic chamber signals now that alcohol
+
1). Cosmic Ray Chambers:
 +
    Simon has checked the cosmic chamber signals now that alcohol
 
     has been added.  Things look much better now.  Several chambers
 
     has been added.  Things look much better now.  Several chambers
 
     are being read out and a crude calibration is in place.  More
 
     are being read out and a crude calibration is in place.  More
 
     work will be done when Simon gets back from vacation.
 
     work will be done when Simon gets back from vacation.
  
2). Comparison of chamber resolution with stretched cathodes shows now
+
2). Small-Scale Prototype:
 +
    Comparison of chamber resolution with stretched cathodes shows now
 
     change from before (i.e. compared to the old wrinkled planes).
 
     change from before (i.e. compared to the old wrinkled planes).
  
3). Brian showed his first mechanical drawing.  Not much to talk about
+
3). Mechanical Drawings:
 +
    Brian showed his first mechanical drawing.  Not much to talk about
 
     as drawing was 0th order.  Brian will continue to work on this.
 
     as drawing was 0th order.  Brian will continue to work on this.
  
4). Brian suggested that we discuss the FDC budget for next year at
+
4). FDC Budget:
    our next FDC meeting.  We can then decide what we want to purchase.
+
  -  Brian suggested that we discuss the FDC budget for next year at
  - DSC will send Brian the R&D budget numbers after the meeting.
+
    our next FDC meeting.  We can then decide what we want to purchase.
 +
  - DSC will send Brian the R&D budget numbers after the meeting.
  
5). DSC reviewed with Brian details from the meeting on 8/28/06
+
5). Circuit Board Design:
 +
    DSC reviewed with Brian details from the meeting on 8/28/06
 
     with Chris Cuevas and Elton regarding who will work on the FDC
 
     with Chris Cuevas and Elton regarding who will work on the FDC
 
     circuit board design.
 
     circuit board design.
  
6). We agreed that it is time to start to perform the load calculations
+
6). Load Calculations:
 +
    We agreed that it is time to start to perform the load calculations
 
     for the frames supporting the wires.
 
     for the frames supporting the wires.
  
 
Minutes prepared by Daniel.  Send any comments or corrections along.
 
Minutes prepared by Daniel.  Send any comments or corrections along.

Revision as of 11:44, 13 December 2006

FDC Weekly Meeting

Date: August 30, 2006

Participants: Daniel, Brian

Next Meeting: Wednesday, September 6, 2006 @ 1:30 p.m.


1). Cosmic Ray Chambers:

   Simon has checked the cosmic chamber signals now that alcohol
   has been added.  Things look much better now.  Several chambers
   are being read out and a crude calibration is in place.  More
   work will be done when Simon gets back from vacation.

2). Small-Scale Prototype:

   Comparison of chamber resolution with stretched cathodes shows now
   change from before (i.e. compared to the old wrinkled planes).

3). Mechanical Drawings:

   Brian showed his first mechanical drawing.  Not much to talk about
   as drawing was 0th order.  Brian will continue to work on this.

4). FDC Budget:

 -  Brian suggested that we discuss the FDC budget for next year at
    our next FDC meeting.  We can then decide what we want to purchase.
 - DSC will send Brian the R&D budget numbers after the meeting.

5). Circuit Board Design:

   DSC reviewed with Brian details from the meeting on 8/28/06
   with Chris Cuevas and Elton regarding who will work on the FDC
   circuit board design.

6). Load Calculations:

   We agreed that it is time to start to perform the load calculations
   for the frames supporting the wires.

Minutes prepared by Daniel. Send any comments or corrections along.