Difference between revisions of "Nov 17, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 28: Line 28:
 
# FCAL
 
# FCAL
 
## Construction Status
 
## Construction Status
## Rad Hard Insert
+
## Rad Hard Insert
 +
Update on Damage Analysis[http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1641 GlueX-doc-1641]
 
# BCAL
 
# BCAL
 
## Construction Status
 
## Construction Status

Revision as of 20:57, 16 November 2010

Teleconference Time: 9:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. SiPMs
    • IU: simulation using geometry for summed units

Tentative Agenda

  1. Calibration
    1. Calibration/Monitoring page: Monitoring R&D
    2. GlueX-doc-1640 Update on Fcal monitoring (Athens)
    3. Requirements for Bcal monitoring (Elton, Zisis and Christina)
  2. Announcements
    • Change of meeting time?
  3. Review of Action Items
  4. FCAL
    1. Construction Status
    2. Rad Hard Insert

Update on Damage AnalysisGlueX-doc-1641

  1. BCAL
    1. Construction Status
    2. Readout segmentation
  2. Simulations
  3. Other Updates

Minutes

Attendees: