Nov 2, 2017 Calorimeter

From GlueXWiki
Revision as of 13:32, 2 November 2017 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Video Conferencing Information

Meeting Time: 11:00 a.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone in CC L207 is 757-269-7084 (usual room)
  • JLab Phone: in CC F326 is 757-269-6460
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Action Items

  1. Check in the code, including scripts, that is used for recent calibrations into git (BCAL: Mark)
  2. Andrei's time calibration cod [Zisis and Elton need to suggest process for checking]
  3. Add Fcal dead channels into the MC
  4. Report back on study of eta with in FCAL [Mark]
  5. Add monitoring plots for charged particle clusterizer [Will to suggest plots and collaborate with Mark]
  6. From Mike's work: -cos(phi) type dependence in the data and a phi dependence at the downstream end of the bcal.

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book

Tentative Agenda

  1. Announcements
  2. Action Items
  3. FCAL Update
    • Run preparations
    • Other updates
  4. BCAL update
    • Run preparations
    • Other updates
  5. Calibrations
  6. Reconstruction and Simulation
  7. NIM articles
  8. Any other business

Minutes

Attending: Elton, Mark, Colin (JLab); Will, Curtis (CMU); Tegan, Andrei, Zisis (UofR); Matt (IU); Sean (NW).


  1. Announcements
  2. Action Items
    • eta in Fcal: Mark noted that the technology is ready. Find large widths in FCAL related to the problematic HI calibrations. Mark to re-run once calibrations for new launch are finalized.
    • charged particle clusterizer: What plots make sense? (Will). Mark: has produced various plots that might be useful, but one needs to pare down the number to a few key plots.
  3. FCAL Update
    1. Run preparations
      • Detector is now back on
      • 12 bases need replacing. Check with Chris/Nick for spares. Test if needed and provide them to Chris for replacement in the FCAL.
      • Low failure rate since turning bases back on. As of this morning, no new failed bases since checking 2 weeks ago.
    2. Calibrations
      • In preparation for next launch tomorrow
      • HV changes will be made based on the new gain constants. Wait a few weeks to check new gains and check analysis launch. Spend time to check code to prepare for HV changes.
      • Matt: Timing calibrations
      • Constants from low-intensity run used for the HI with adjustments made to smooth near-neighbor variations. Use these for the upcoming launch
      • See Log Entry 3490937
      • Time resolution is about 0.3 ns at 1 GeV for both data sets. HI slightly worse resolution than LI. These times use the new method of determining the time from the energy-weighted average time. They also require a new time-walk correction function with one more parameters (ccdb needs to be modified)
      • Plan to check in new code this afternoon in time for the monitoring launch tomorrow.
      • Colin: gain calibrations:
      • Gain constants are converging. Added one more fiducial volume cut to one of the paired photons.
      • If next iteration is unchanged, the set of gain constants can be used to update ccdb.
    3. Sean comments
      1. After last iteration, need to update non-linearity correction, which should have a small effect. Systematic remain at high energy. Matt: Note that at high energy, pi0 photons coalesce so cannot be used to determine the pi0 mass without bias.
      2. After calibration for high energy data, need to go back and recalibrate the low intensity data and 2016 with new geometry changes. 2017 Intermediate period between low and hi intensity also needs calibration. Matt points out that this is part of HI data set, so constants determined now will be used. However, small adjustments could be made based on HV changes at that time. Mark: Scale factor remains on energy scale. Colin: that is adjusted using the non-linearity correction.
      3. Mark: Should determine the gg mass at higher energy and obtain the eta mass as a consistency check of the energy scale.
  4. BCAL update
    1. Run preparations
      • Elton: BCAL was turned on
      • Tegan and Ahmed took LED data and checked that all SiPMs are operational
      • The upstream and downstream chiller systems were flushed by Josh. The upstream had some air in the lines and needed to drained. Seems ok now.
    2. Other updates
  5. Calibrations
  6. Reconstruction and Simulation
  7. NIM articles
  8. Any other business