(Items for followup from previous meeting(s))
Line 14: Line 14:
  
 
# Monitoring
 
# Monitoring
#* Send Christina drawings of light guides, both versions (Elton)
+
#* <strike> Send Christina drawings of light guides, both versions (Elton) </strike>
#* Send Christina precisely which geometry/version of light guides were shipped (Iñaki)
+
#* Send Christina precisely which geometry/version of light guides were shipped (Iñaki)  
 
#* Send additional SiPMs to Athens for tests (Elton)
 
#* Send additional SiPMs to Athens for tests (Elton)
 
# USM testing
 
# USM testing

Revision as of 15:14, 22 November 2011

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Send Christina drawings of light guides, both versions (Elton)
    • Send Christina precisely which geometry/version of light guides were shipped (Iñaki)
    • Send additional SiPMs to Athens for tests (Elton)
  2. USM testing
    • Web site test next Monday.
    • Show data from dark box at next meeting.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. Beam tests in Hall B (fall 2011) (John)
  5. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  6. BCAL
    1. Construction Status: builds, mini module
    2. Fibres
  7. USM update
    • Note from Will: I have a schedule conflict with this meeting. However, Hayk is at JLab taking shifts (I don't know if he's available) and some of the others may be available for joining the meeting remotely.
    • Sergey currently thinks we can demonstrate working test stations for a December 15 review. We need to discuss this somewhat more before finalizing it, and of course we should send you documentation quite soon if this is going to happen on that date.
  8. Simulations/Reconstruction
  9. Any other business

Minutes

Attending:

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. Beam tests in Hall B (fall 2011) (John)
  5. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  6. BCAL
    1. Construction Status: builds, mini module
    2. Fibres
  7. USM update
    • Note from Will: I have a schedule conflict with this meeting. However, Hayk is at JLab taking shifts (I don't know if he's available) and some of the others may be available for joining the meeting remotely.
    • Sergey currently thinks we can demonstrate working test stations for a December 15 review. We need to discuss this somewhat more before finalizing it, and of course we should send you documentation quite soon if this is going to happen on that date.
  8. Simulations/Reconstruction
  9. Any other business