Difference between revisions of "Nov 3, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Action Items from previous meetings == # Fernando to verify location of standoffs for circuit board. == Tentative Agenda == # Announcements # Action Items # Schedule, repor...")
 
(Action Items from previous meetings)
Line 1: Line 1:
 
== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# Fernando to verify location of standoffs for circuit board.
+
# Verify location of standoffs for circuit board. (Fernando)
 +
# Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 16:01, 13 October 2011

Action Items from previous meetings

  1. Verify location of standoffs for circuit board. (Fernando)
  2. Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
    • Progress, EVMS updates next week
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
    • Drawings proceeding, Chuck will get back to this next week
    • Items to be finalized: standoff locations need to be confirmed by Fernando. Chris as entered them onto the layout and they seem ok.
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: