Difference between revisions of "Nov 3, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Tentative Agenda)
Line 10: Line 10:
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
 
#* Progress, EVMS updates next week
 
#* Progress, EVMS updates next week
# SiPM testing (everyone)
+
# SiPM production testing (everyone)
 
## Light source / optics
 
## Light source / optics
 
## Electronic boards
 
## Electronic boards
Line 16: Line 16:
 
## Cooling plate
 
## Cooling plate
 
## Other?
 
## Other?
 +
# SiPM testing (Ivan)
 
# Mechanical (Jim)
 
# Mechanical (Jim)
 
#* Drawings proceeding, Chuck will get back to this next week
 
#* Drawings proceeding, Chuck will get back to this next week
 
#* Items to be finalized: standoff locations need to be confirmed by Fernando. Chris as entered them onto the layout and they seem ok.
 
#* Items to be finalized: standoff locations need to be confirmed by Fernando. Chris as entered them onto the layout and they seem ok.
 
# Mechanical drawings (Chuck)
 
# Mechanical drawings (Chuck)
# Geometry (Elton)
 
 
# Temperature compensation (Jack)
 
# Temperature compensation (Jack)
 
# Preamp-summing (Fernando)
 
# Preamp-summing (Fernando)
# Granularity (Elton)
 
  
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:

Revision as of 16:30, 13 October 2011

Action Items from previous meetings

  1. Verify location of standoffs for circuit board. (Fernando)
  2. Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
    • Progress, EVMS updates next week
  4. SiPM production testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. SiPM testing (Ivan)
  6. Mechanical (Jim)
    • Drawings proceeding, Chuck will get back to this next week
    • Items to be finalized: standoff locations need to be confirmed by Fernando. Chris as entered them onto the layout and they seem ok.
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)

Minutes

Attending: