Difference between revisions of "Nov 3, 2011 SiPM Electrical and Cooling"
From GlueXWiki
m (moved Oct 27, 2011 SiPM Electrical and Cooling to Nov 3, 2011 SiPM Electrical and Cooling: wrong date) |
(→Action Items from previous meetings) |
||
Line 3: | Line 3: | ||
# Verify location of standoffs for circuit board. (Fernando) | # Verify location of standoffs for circuit board. (Fernando) | ||
# Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim) | # Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim) | ||
+ | # Jack to update board with bias compensation circuitry (Jack) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 17:37, 2 November 2011
Action Items from previous meetings
- Verify location of standoffs for circuit board. (Fernando)
- Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
- Jack to update board with bias compensation circuitry (Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Progress, EVMS updates next week
- SiPM production testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- SiPM testing (Ivan)
- Mechanical (Jim)
- Drawings proceeding, Chuck will get back to this next week
- Items to be finalized: standoff locations need to be confirmed by Fernando. Chris as entered them onto the layout and they seem ok.
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
Minutes
Attending: