Difference between revisions of "Nov 3, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Tentative Agenda)
Line 10: Line 10:
 
# Action Items
 
# Action Items
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
#* Progress, EVMS updates next week
 
 
# SiPM production testing (everyone)
 
# SiPM production testing (everyone)
 
## Light source / optics
 
## Light source / optics
Line 18: Line 17:
 
## Other?
 
## Other?
 
# SiPM testing (Ivan)
 
# SiPM testing (Ivan)
 +
# Mechanical assembly (Scot)
 
# Mechanical (Jim)
 
# Mechanical (Jim)
#* Drawings proceeding, Chuck will get back to this next week
 
#* Items to be finalized: standoff locations need to be confirmed by Fernando. Chris as entered them onto the layout and they seem ok.
 
 
# Mechanical drawings (Chuck)
 
# Mechanical drawings (Chuck)
 
# Temperature compensation (Jack)
 
# Temperature compensation (Jack)

Revision as of 17:39, 2 November 2011

Action Items from previous meetings

  1. Verify location of standoffs for circuit board. (Fernando)
  2. Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
  3. Jack to update board with bias compensation circuitry (Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. SiPM testing (Ivan)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)

Minutes

Attending: