Difference between revisions of "Nov 3, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Tentative Agenda) |
||
Line 10: | Line 10: | ||
# Action Items | # Action Items | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
− | |||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
## Light source / optics | ## Light source / optics | ||
Line 18: | Line 17: | ||
## Other? | ## Other? | ||
# SiPM testing (Ivan) | # SiPM testing (Ivan) | ||
+ | # Mechanical assembly (Scot) | ||
# Mechanical (Jim) | # Mechanical (Jim) | ||
− | |||
− | |||
# Mechanical drawings (Chuck) | # Mechanical drawings (Chuck) | ||
# Temperature compensation (Jack) | # Temperature compensation (Jack) |
Revision as of 17:39, 2 November 2011
Action Items from previous meetings
- Verify location of standoffs for circuit board. (Fernando)
- Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
- Jack to update board with bias compensation circuitry (Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- SiPM testing (Ivan)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
Minutes
Attending: