Nov 3, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 15:58, 13 October 2011 by Elton (Talk | contribs) (Created page with "== Action Items from previous meetings == # Fernando to verify location of standoffs for circuit board. == Tentative Agenda == # Announcements # Action Items # Schedule, repor...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Action Items from previous meetings

  1. Fernando to verify location of standoffs for circuit board.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
    • Progress, EVMS updates next week
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
    • Drawings proceeding, Chuck will get back to this next week
    • Items to be finalized: standoff locations need to be confirmed by Fernando. Chris as entered them onto the layout and they seem ok.
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: