Difference between revisions of "November 04, 2021 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 11: Line 11:
 
** Lead absorbers - awarded
 
** Lead absorbers - awarded
 
** All assembly hardware wither here or due in by December
 
** All assembly hardware wither here or due in by December
** Stand All parts here -assembled in the TEDF High bay [[image:cpp_install_test.jpg|thumb]]  
+
** Test install in the TEDF High bay [[image:cpp_install_test.jpg|thumb]]  
** Steel - all received [[image:cpp_steel_3.jpg|thumb]]
+
** Absorber install [[image:cpp_install_test1.jpg|thumb]]
 
* Installation/assy 3D Model and dwgs
 
* Installation/assy 3D Model and dwgs
 
** DS Chamber orientation?
 
** DS Chamber orientation?

Revision as of 14:31, 4 November 2021

Meeting Time and Place

Thursday November 02, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/September_21,_2021_CPP_Design_Meeting
  • Testing status - Beni/Elton
  • Design/Fab/Procurement status
    • Lead absorbers - awarded
    • All assembly hardware wither here or due in by December
    • Test install in the TEDF High bay
      Cpp install test.jpg
    • Absorber install
      Cpp install test1.jpg
  • Installation/assy 3D Model and dwgs
    • DS Chamber orientation?
    • Scintillator orientation?
    • assembly components - drawings released
    • Installation drawings in review
  • Target Design in work
    Cpp target1.jpg
    Cpp target2.jpg
    Cpp target3.jpg
    Cpp target4.jpg
    • 3cm bore ok?
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes