November 11, 2019 DIRC
From GlueXWiki
Meeting Information
GlueX DIRC Meeting
Monday November 11, 2019
1:00 pm, EDT
Hall D Counting House
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- All gluing completed last week
- North OB assembly and installation (All)
- Gluing and assembly completed last week [2] [3]
- Mirror box installation today followed by diffuser installation plumbing and water fill
- Survey expected Wed/Thurs this week
- South OB (All)
- Gluing completed last week, cured over the weekend. Final mirrors taped in place today
- Silicone seal and mirror box assembly over the next few days
- Plan installation by the end of the week and survey to follow next week
- LED diffuser Update (Bill)
- Readout tests (Justin, Bill, All)
- After mirror boxes are installed with new diffusers we'll retake LED data (maybe this afternoon for North OB)
- Fall 2019 Run Plan (All)
- Spring 2019 DIRC Commissioning Analysis (All)
- New production announcement e-mail
- Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
- Existing simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
- /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2pi/
- /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2k/
- New simulation samples (100M events each) should be ready this week. Producing for both Spring 2019 (commissioning) and Fall 2019 (borosilicate mirrors)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Commissioning Analyses Update (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- New production announcement e-mail
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB