November 12, 2010 Des/Fab Meeting

From GlueXWiki
Revision as of 08:43, 19 November 2010 by Whitey (Talk | contribs) (Outstanding Action Items)

Jump to: navigation, search

Meeting Time and Place

Friday Nov 12, 2010 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 428

Agenda

  • ESH&Q minute
  • Announcements
    • Evaluations
    • training
  • phones/pagers? *
  • Upcoming reviews *
  • Installation plans *
  • Solenoid Test Status *
  • Solenoid replacement plans *
  • Civil construction Status *
  • BCAL QA and testing plans *
  • Tagger magnet status
  • FDC construction preparations
  • Cryo transfer line update
  • Space issues (ESB )
  • Manpower (Eng,Tech,Des)

Outstanding Action Items

  • Need to develop a leak check and assy plan for cryo lines (Jim/Tom) in work. The entire package to be reviewed by the cryo group

* Identify PLC programmer to take over for Mark Wissman (Tim)<strike>

  • Set up for Dave to give presentation on FDC procedures at a later meeting (Tim)
  • Complete Power OSP for solenoid test (all)
  • Need list of people needing access to the ESB (Rad area abd building owner is FM)

Discussions

  • Equipment in ESB requires property storage request
  • COO for Hall D to be read and signed before work in the hall
  • Introduced Al Johnson
    • In attendance W. Crahen, J. Fochtman, T. Carstens, C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz, J. Foyles, M. Stevens, R. Bunton, G. Humble, C. Heck, D. Butler, K. Sullivan, W. Sachleben, A. Johnson Tim Whitlatch

==Action Items==