Difference between revisions of "November 18, 2011 Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "Friday Nov 18, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231 == Agenda == * ESH&Q minute - safety observations * Announcements ** Appraisals status...")
 
(Agenda)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
  
 
== Agenda ==
 
== Agenda ==
* ESH&Q minute - safety observations
+
* ESH&Q minute - animal safety
 
* Announcements  
 
* Announcements  
 
** Appraisals status
 
** Appraisals status
 
** Walkthrough punchlist/Beneficial occupancy - Dec 1
 
** Walkthrough punchlist/Beneficial occupancy - Dec 1
 
** Hall D open house Dec 2
 
** Hall D open house Dec 2
** JLAB Strategic planning
+
** Vacation Donation
 
** Presentations available M:\halld\Engineering\Presentations
 
** Presentations available M:\halld\Engineering\Presentations
 
**  training - up to date?
 
**  training - up to date?
 
* CAD update
 
* CAD update
 
* Upstream platform install Status - Tom
 
* Upstream platform install Status - Tom
* TOF/Start counter update
+
* Solenoid Install/Interface
 
* FDC construction update - Bill
 
* FDC construction update - Bill
* Tagger Magnet/vacuum chamber
+
* Large Vacuum chamber specs
 
* Target update
 
* Target update
 
* BCAL readout update
 
* BCAL readout update
 
* Collimator beamline update
 
* Collimator beamline update
 
* Downstream/Solenoid Platforms update
 
* Downstream/Solenoid Platforms update
 +
* Electrical - Giles
 
* Mock up update -
 
* Mock up update -
 
* Spare solenoid
 
* Spare solenoid
Line 29: Line 30:
 
* Get with Tom on Beamline fab tasks - Slava
 
* Get with Tom on Beamline fab tasks - Slava
 
* Post .pdf manpower assignments on M drive - Tim
 
* Post .pdf manpower assignments on M drive - Tim
 +
* Update Hall D/Tagger COO - Tom/Tim
  
 
==Minutes==
 
==Minutes==

Latest revision as of 08:46, 18 November 2011

Friday Nov 18, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • ESH&Q minute - animal safety
  • Announcements
    • Appraisals status
    • Walkthrough punchlist/Beneficial occupancy - Dec 1
    • Hall D open house Dec 2
    • Vacation Donation
    • Presentations available M:\halld\Engineering\Presentations
    • training - up to date?
  • CAD update
  • Upstream platform install Status - Tom
  • Solenoid Install/Interface
  • FDC construction update - Bill
  • Large Vacuum chamber specs
  • Target update
  • BCAL readout update
  • Collimator beamline update
  • Downstream/Solenoid Platforms update
  • Electrical - Giles
  • Mock up update -
  • Spare solenoid
  • Fabrication/installation work - Tom

Outstanding Action Items

  • Discuss with Eugene who owner of Counting house will be - Hovannes has been assigned
  • Get with Tom on Beamline fab tasks - Slava
  • Post .pdf manpower assignments on M drive - Tim
  • Update Hall D/Tagger COO - Tom/Tim

Minutes

    • In attendance W. Crahen, J. Fochtman, V. Razmyslovich, J. Lagner, G. Browns, R. Getz, W. Sachleben, Tim Whitlatch, J. Conger, C. Hutton