(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday November 25, 2019<br> 1:00 pm, EDT<br> Hall D Counting House <br> == Connection Using Bluejeans == # To join via Poly...")
 
Line 20: Line 20:
 
#* North OB water leak: [https://logbooks.jlab.org/entry/3741208 initial rate],  [https://logbooks.jlab.org/entry/3741685 after 1 week], [https://logbooks.jlab.org/entry/3743655 after 2 weeks]
 
#* North OB water leak: [https://logbooks.jlab.org/entry/3741208 initial rate],  [https://logbooks.jlab.org/entry/3741685 after 1 week], [https://logbooks.jlab.org/entry/3743655 after 2 weeks]
 
#* North OB LED test: [https://logbooks.jlab.org/entry/3741062 before water fill], [https://logbooks.jlab.org/entry/3741247 after water fill]
 
#* North OB LED test: [https://logbooks.jlab.org/entry/3741062 before water fill], [https://logbooks.jlab.org/entry/3741247 after water fill]
 
+
#* South Mirror box: [https://logbooks.jlab.org/entry/3741949 assembly and installation], [https://logbooks.jlab.org/entry/3741951 potential mirror issues],
 +
#* South OB LED test: [https://logbooks.jlab.org/entry/3742162 before water fill], [https://logbooks.jlab.org/entry/3742300 after water fill]
 
#* Comparison of LED occupancy with and without water filled (Bill)
 
#* Comparison of LED occupancy with and without water filled (Bill)
 
#* [https://logbooks.jlab.org/entry/3741420 FPGA temperatures in EPICS] and now give an alarm if they exceed 60 C.
 
#* [https://logbooks.jlab.org/entry/3741420 FPGA temperatures in EPICS] and now give an alarm if they exceed 60 C.
 +
#* [https://logbooks.jlab.org/entry/3742190 DIRC moved to beam position]
 
# Survey's complete: initial values consistent with Spring 2019 surveys
 
# Survey's complete: initial values consistent with Spring 2019 surveys
 
# Readout/DAQ tests and issues (Justin, Bill, All)
 
# Readout/DAQ tests and issues (Justin, Bill, All)
#* [https://logbooks.jlab.org/entry/3741252 Missing pixel]
+
#* [https://logbooks.jlab.org/entry/3741252 Missing pixel] and [https://logbooks.jlab.org/entry/3742308 appearance of dummy pixels]
 +
#* [https://logbooks.jlab.org/entry/3742298 Poor livetime when EPICs IOC is running at 100% CPU usage], crate controller CPU replaced (with 8 cores) [https://logbooks.jlab.org/entry/3742617 problem resolved]
 
#* After mirror boxes are installed with new diffusers we'll retake LED data (maybe this afternoon for North OB)
 
#* After mirror boxes are installed with new diffusers we'll retake LED data (maybe this afternoon for North OB)
 
# [https://logbooks.jlab.org/entry/3741413 Spare electronics] (Bill, Andrew)
 
# [https://logbooks.jlab.org/entry/3741413 Spare electronics] (Bill, Andrew)

Revision as of 07:21, 25 November 2019

Meeting Information

GlueX DIRC Meeting
Monday November 25, 2019
1:00 pm, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Installation complete!
  3. Survey's complete: initial values consistent with Spring 2019 surveys
  4. Readout/DAQ tests and issues (Justin, Bill, All)
  5. Spare electronics (Bill, Andrew)
  6. Fall 2019 Run Plan (All)
  7. Spring 2019 DIRC Commissioning Analysis (All)
    • Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
    • Existing simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2pi/
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2k/
    • New simulation samples (100M events each): various job failures that Justin is still tracking down:

E*** Samples for both Spring 2019 (commissioning) and Fall 2019 (borosilicate mirrors) will be produced

    • Commissioning LUT analyses (All)
      • Cherenkov ring fit (Roman)
      • Commissioning Analyses Update (Ahmed)
    • Commissioning FastDIRC update (Yunjie)
  1. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  2. Software overview and tasks (All)
  3. AOB