Line 3: Line 3:
 
:: - parameters for fa125 initialization  
 
:: - parameters for fa125 initialization  
 
:: - implementation of SYNC events (in progress)
 
:: - implementation of SYNC events (in progress)
:: - configuration of TPOL, concurrent running with ST (in progress)
+
:: - configuration of TRD, concurrent running with ST (in progress)
  
 
* Other
 
* Other
 
:: - new TS firmware (check in progress)
 
:: - new TS firmware (check in progress)
:: - BCAL LED trigger distribution through the TS (done)
+
:: - BCAL LED trigger distribution through TS  
 +
:: - TPOL stand alone CTP self-trigger
  
 
   
 
   

Revision as of 10:08, 30 November 2015

  • Modifications of config files
- parameters for CAEN R-C adjustment
- parameters for fa125 initialization
- implementation of SYNC events (in progress)
- configuration of TRD, concurrent running with ST (in progress)
  • Other
- new TS firmware (check in progress)
- BCAL LED trigger distribution through TS
- TPOL stand alone CTP self-trigger



  • New firmware for F1TDC
- update v3 firmware to the version v3_127
  • CAEN TDC multi-block readout
  • Scalers implementation at SYNC event
- asynchronous pedestals
  • L1 trigger commissioning plans for the fall run
- TAGM calibration (PS trigger)
- FDC alignment (ST/TOF + FCAL)
- FCAL/BCAL triggers (Energy sum)
- Trigger produced by TAGM/TAGH