Difference between revisions of "November 30, 2015"

From GlueXWiki
Jump to: navigation, search
Line 10: Line 10:
 
:: - TPOL stand alone CTP self-trigger  
 
:: - TPOL stand alone CTP self-trigger  
  
 
  
 
+
* Preparation for the commissioning run
* New firmware for F1TDC
+
:: - update v3 firmware to the version v3_127
+
 
+
* CAEN TDC multi-block readout
+
 
+
* Scalers implementation at SYNC event
+
:: - asynchronous pedestals
+
 
+
* L1 trigger commissioning plans for the fall run
+
 
:: - TAGM calibration (PS trigger)
 
:: - TAGM calibration (PS trigger)
 
:: - FDC alignment (ST/TOF + FCAL)
 
:: - FDC alignment (ST/TOF + FCAL)
 
:: - FCAL/BCAL triggers  (Energy sum)
 
:: - FCAL/BCAL triggers  (Energy sum)
 
:: - Trigger produced by TAGM/TAGH
 
:: - Trigger produced by TAGM/TAGH

Revision as of 10:13, 30 November 2015

  • Modifications of config files
- parameters for CAEN R-C adjustment
- parameters for fa125 initialization
- implementation of SYNC events (in progress)
- configuration of TRD, concurrent running with ST (in progress)
  • Other
- new TS firmware (check in progress)
- BCAL LED trigger distribution through TS
- TPOL stand alone CTP self-trigger


  • Preparation for the commissioning run
- TAGM calibration (PS trigger)
- FDC alignment (ST/TOF + FCAL)
- FCAL/BCAL triggers (Energy sum)
- Trigger produced by TAGM/TAGH