Difference between revisions of "November 30, 2015"
From GlueXWiki
Line 16: | Line 16: | ||
::: - production (1 - 2 night shifts) | ::: - production (1 - 2 night shifts) | ||
:::: run conditions depend on the accelerator performance (200 nA electron current, 10^-4 radiator, 10^-3 converter + Be converter) | :::: run conditions depend on the accelerator performance (200 nA electron current, 10^-4 radiator, 10^-3 converter + Be converter) | ||
− | ::* | + | ::* Trigger for FDC alignment (ST/TOF + FCAL) |
− | ::* | + | ::* Trigger for FCAL MIPS calibration (ST & TOF) |
− | ::: test/debug trigger (3 - 4 hours) | + | ::: - test/debug trigger (3 - 4 hours, CDC/FDC switched off) |
− | ::: production at low luminosity with FDC switched on (1 - 2 night shifts) | + | ::: production at low luminosity with the FDC switched on (1 - 2 night shifts for both triggers) |
::* Debug FCAL/BCAL trigger | ::* Debug FCAL/BCAL trigger | ||
::: - test/debug trigger (3 - 4 hours) | ::: - test/debug trigger (3 - 4 hours) | ||
::: - take data with the BCAL/FCAL trigger (1 - 2 night shifts). FCAL/BCAL thresholds will be tuned. | ::: - take data with the BCAL/FCAL trigger (1 - 2 night shifts). FCAL/BCAL thresholds will be tuned. | ||
− | ::: - test | + | ::: - test trigger performance at high rate. Take data with 'nominal' trigger thresholds. |
− | ::* | + | ::* Trigger generated by TAGM/TAGH |
− | + | ::: - test/debug (3 - 4 hours) | |
− | + | ::: - combine TAGH/TAGM with other trigger types | |
+ | ::: - take data with the total absorption counter, 1x10-5 radiator, a few nA current (TBD). (2 - 3) hours | ||
:: - Requests from sub-detectors | :: - Requests from sub-detectors |
Revision as of 18:55, 10 December 2015
- Modifications of config files
- - parameters for CAEN R-C adjustment
- - parameters for fa125 initialization
- - implementation of SYNC events (in progress)
- - configuration of TRD, concurrent running with ST (in progress)
- Other
- - new TS firmware (check in progress)
- - BCAL LED trigger distribution through TS
- - TPOL stand alone self-trigger with CTP
- L1 trigger commissioning plans for the fall run
- PS trigger (TAGM bias voltage calibration, TAGH voltage scans). Run TRD in parallel, if no problems.
- - test/debug trigger (2 - 3 hours).
- - production (1 - 2 night shifts)
- run conditions depend on the accelerator performance (200 nA electron current, 10^-4 radiator, 10^-3 converter + Be converter)
- Trigger for FDC alignment (ST/TOF + FCAL)
- Trigger for FCAL MIPS calibration (ST & TOF)
- - test/debug trigger (3 - 4 hours, CDC/FDC switched off)
- production at low luminosity with the FDC switched on (1 - 2 night shifts for both triggers)
- Debug FCAL/BCAL trigger
- - test/debug trigger (3 - 4 hours)
- - take data with the BCAL/FCAL trigger (1 - 2 night shifts). FCAL/BCAL thresholds will be tuned.
- - test trigger performance at high rate. Take data with 'nominal' trigger thresholds.
- Trigger generated by TAGM/TAGH
- - test/debug (3 - 4 hours)
- - combine TAGH/TAGM with other trigger types
- - take data with the total absorption counter, 1x10-5 radiator, a few nA current (TBD). (2 - 3) hours
- - Requests from sub-detectors