November 30, 2015

From GlueXWiki
Revision as of 16:54, 10 December 2015 by Somov (Talk | contribs)

Jump to: navigation, search
  • Modifications of config files
- parameters for CAEN R-C adjustment
- parameters for fa125 initialization
- implementation of SYNC events (in progress)
- configuration of TRD, concurrent running with ST (in progress)
  • Other
- new TS firmware (check in progress)
- BCAL LED trigger distribution through TS
- TPOL stand alone self-trigger with CTP


  • L1 trigger commissioning plans for the fall run
  1. PS trigger (TAGM bias voltage calibration, TAGH voltage scans). Run TRD in parallel, if no problems.
- test/debug trigger (2 - 3 hours).
- production (1 - 2 night shifts)
  1. Debug trigger for FDC alignment (ST/TOF + FCAL)
test/debug trigger (3 - 4 hours)
-
- Debu
- Trigger produced by TAGM/TAGH
- Requests from sub-detectors