  • Modifications of config files
- parameters for CAEN R-C adjustment
- parameters for fa125 initialization
- implementation of SYNC events (in progress)
- configuration of TRD, concurrent running with ST (in progress)
  • Other
- new TS firmware (check in progress)
- BCAL LED trigger distribution through TS
- TPOL stand alone self-trigger with CTP


  • L1 trigger commissioning plans for the fall run
  • PS trigger (TAGM bias voltage calibration, TAGH voltage scans). Run TRD in parallel, if no problems.
- test/debug trigger (2 - 3 hours).
- production (1 - 2 night shifts)
run conditions depend on the accelerator performance (200 nA electron current, 10^-4 radiator, 10^-3 converter
  • Debug trigger for FDC alignment (ST/TOF + FCAL)
test/debug trigger (3 - 4 hours)
production at low luminosity (with FDC switched on) - night
  • Debug FCAL/BCAL trigger
- test/debug trigger (3 - 4 hours)
- take data with the BCAL/FCAL trigger for 1 night shift (thresholds will be tuned)
- Trigger produced by TAGM/TAGH
- Requests from sub-detectors