November 30, 2015
From GlueXWiki
- Modifications of config files
- - parameters for CAEN R-C adjustment
- - parameters for fa125 initialization
- - implementation of SYNC events (in progress)
- - configuration of TRD, concurrent running with ST (in progress)
- Other
- - new TS firmware (check in progress)
- - BCAL LED trigger distribution through TS
- - TPOL stand alone self-trigger with CTP
- L1 trigger commissioning plans for the fall run
- PS trigger (TAGM bias voltage calibration, TAGH voltage scans). Run TRD in parallel, if no problems.
- - test/debug trigger (2 - 3 hours).
- - production (1 - 2 night shifts)
- run conditions depend on the accelerator performance (200 nA electron current, 10^-4 radiator, 10^-3 converter
- Debug trigger for FDC alignment (ST/TOF + FCAL)
- test/debug trigger (3 - 4 hours)
- production at low luminosity (with FDC switched on) - night
- Debug FCAL/BCAL trigger
- - test/debug trigger (3 - 4 hours)
- - take data with the BCAL/FCAL trigger for 1 night shift (thresholds will be tuned)
- - Trigger produced by TAGM/TAGH
- - Requests from sub-detectors