Difference between revisions of "November 9, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 24: Line 24:
 
#* Discussion of possible strategies for mirror replacement and timeline
 
#* Discussion of possible strategies for mirror replacement and timeline
 
# South box module [https://logbooks.jlab.org/entry/3856948 diagnostic] and replacement plan (Bill)
 
# South box module [https://logbooks.jlab.org/entry/3856948 diagnostic] and replacement plan (Bill)
# [https://www.jlab.org/Hall-D/engineering.php Hall D Engineering Page]: current [detailed https://www.jlab.org/Hall-D/engineering/Hall%20D%20SAD%202020v2.pdf schedule]
+
# [https://www.jlab.org/Hall-D/engineering.php Hall D Engineering Page]: current [https://www.jlab.org/Hall-D/engineering/Hall%20D%20SAD%202020v2.pdf detailed schedule]
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status] (Justin)
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status] (Justin)

Revision as of 13:55, 9 November 2020

Meeting Information

GlueX DIRC Meeting
Monday November 9, 2020
1:00 pm, EDT
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. DIRC survey results (Bill, All)
  3. Optical Box inspection (Bill, All)
  4. South box module diagnostic and replacement plan (Bill)
  5. Hall D Engineering Page: current detailed schedule
  6. DIRC commissioning analyses and 2020 studies (All)
  7. Follow-up on additional action items from workfest (All)
    • 100M event MC samples required for ρ and φ data/MC comparisons:
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
  8. AOB