Difference between revisions of "OWG Meeting 22-Jul-2009"
From GlueXWiki
m |
m |
||
Line 27: | Line 27: | ||
==Next Meeting== | ==Next Meeting== | ||
− | + | Wed 19-Aug-2009 1:30pm CC F326 | |
==New Action Items from this Meeting== | ==New Action Items from this Meeting== | ||
+ | |||
+ | * Turn offline reconstruction program into a Coda Object - Dave L, Elliott | ||
=Minutes= | =Minutes= | ||
+ | |||
+ | Present: Elliott W, Dave L, Chris C, Simon T, Dave D, Dave A, Vardan G, Graham H, Fernando B, Beni Z, Eugene C. | ||
+ | |||
+ | |||
+ | '''Electronics''' | ||
+ | |||
+ | Fernando gave a brief update on the status of the FADC125 and other boards: | ||
+ | |||
+ | * Bare board ready, mezzanine design done, 15 FPGA's total. | ||
+ | * Expect final cost approx $4k for 72 channel module. | ||
+ | * Has 3 x 24 channel connectors. | ||
+ | * Will have 3 ready by 1-Oct - one for JLab, one for CMU, one for IUCF. | ||
+ | * Production testing perhaps at IUCF, not sure yet. | ||
+ | * Dave A will produce readout libraries, about 6 weeks after he receives a board. | ||
+ | * Expect solid board and lib by end of 2009. | ||
+ | * About 70 Watts/board, similar to FADC250. | ||
+ | * F1TDC v2 and FADC250 v2 planned for FY10, redesigns starting now. These are production boards for Hall D. | ||
+ | * Two types of F1TDC inputs: ECL and LVDS, depending on front-end plug-in module. | ||
+ | |||
+ | |||
+ | Chris summarized some additional work: | ||
+ | |||
+ | * Trigger workshop went well, see notes and summary on Wiki. | ||
+ | * Got new requirements at workshop, esp for FADC250. | ||
+ | * Will hold again next year. | ||
+ | * Firmware changes for all boards not simple, takes planning and time. Cannot do this too often. | ||
+ | * Global trigger boards planned for FY10 (GTP, TS, etc.). | ||
+ | * New hires in Electronics and DAQ groups coming soon. |
Revision as of 14:18, 23 July 2009
Contents
Agenda
- Announcements -
- FADC125 status - Fernando
- Review of minutes from 24-Jun-2009 meeting
- Report from Trigger Workshop - Alex, others
- Solenoid coil test update and To Do list - Elliott
- Java EVIO - Graham, Elliott
- Online farm software development strategy and status - Graham, others
- CAN controller at IU - Elliott
- New daLog browser and CodaObjects - Vardan, Elliott
- Electronics and trigger status reports - Fernando, Chris, Ben, Ed, Alex, Dave
Time/Location
1:30 PM Wed 22-Jul-2009 CC F326
Announcements
Next Meeting
Wed 19-Aug-2009 1:30pm CC F326
New Action Items from this Meeting
- Turn offline reconstruction program into a Coda Object - Dave L, Elliott
Minutes
Present: Elliott W, Dave L, Chris C, Simon T, Dave D, Dave A, Vardan G, Graham H, Fernando B, Beni Z, Eugene C.
Electronics
Fernando gave a brief update on the status of the FADC125 and other boards:
- Bare board ready, mezzanine design done, 15 FPGA's total.
- Expect final cost approx $4k for 72 channel module.
- Has 3 x 24 channel connectors.
- Will have 3 ready by 1-Oct - one for JLab, one for CMU, one for IUCF.
- Production testing perhaps at IUCF, not sure yet.
- Dave A will produce readout libraries, about 6 weeks after he receives a board.
- Expect solid board and lib by end of 2009.
- About 70 Watts/board, similar to FADC250.
- F1TDC v2 and FADC250 v2 planned for FY10, redesigns starting now. These are production boards for Hall D.
- Two types of F1TDC inputs: ECL and LVDS, depending on front-end plug-in module.
Chris summarized some additional work:
- Trigger workshop went well, see notes and summary on Wiki.
- Got new requirements at workshop, esp for FADC250.
- Will hold again next year.
- Firmware changes for all boards not simple, takes planning and time. Cannot do this too often.
- Global trigger boards planned for FY10 (GTP, TS, etc.).
- New hires in Electronics and DAQ groups coming soon.