Difference between revisions of "OWG meeting 29-Aug-2007"

From GlueXWiki
Jump to: navigation, search
m
m
Line 12: Line 12:
  
 
* Brief intro and overview - Elliott W
 
* Brief intro and overview - Elliott W
* Channel counts, etc. - Fernando B
+
* [[Media:2007-08-29_Electronics.pdf|Channel counts, etc.]]- Fernando B
 
* Latest simulation results on occupancies - David L
 
* Latest simulation results on occupancies - David L
* Constraints from VME and network interfaces [[Media:2007-08-29_VME_DAQ_Rates.pdf]] - Dave A
+
* [[Media:2007-08-29_VME_DAQ_Rates.pdf|Constraints from VME and Network Interfaces]] - Dave A
 
* Recent results on extracting time from ADC data - Simon T[http://www.jlab.org/~staylor/fadc_timing.pdf]
 
* Recent results on extracting time from ADC data - Simon T[http://www.jlab.org/~staylor/fadc_timing.pdf]
 
* Design of 125 MHz FADC, FPGA capabilities, etc. relevant for event size - Gerard V
 
* Design of 125 MHz FADC, FPGA capabilities, etc. relevant for event size - Gerard V

Revision as of 12:02, 29 August 2007

Overview

This is a special one-topic meeting whose goal is to try to understand the event size given the recent simulation results on occupancies, especially in the FDC. Note that the 2002 Hall D design document lists a 4kB average event size, although it is possible that the FDC itself may take 4kB (or even more). The average event size affects the design of the DAQ system in a number of ways, so this needs to be understood sooner rather than later. Fortunately the DAQ architecture is highly scalable, so accomodating higher event sizes and event rates is not a big problem.

The goal of this meeting is to:

  1. Understand what we know and do not know about event size, occupancies, etc.
  2. Devise a plan to learn what we need to learn


Agenda


Time/Location

1:00pm Wed 29-Aug-2007 Cebaf Center F224

To phone in, send me your telephone number and I'll call you.


Announcements

Next Meeting

  • TBD (some of us will be out of town the first week of Sep, and OECM review is second week of Sep)


New Action Items from this Meeting

Minutes