Difference between revisions of "Oct 1, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Items for followup from previous meeting(s))
Line 13: Line 13:
 
# Two components fit for fiber attenuation (Zisis)
 
# Two components fit for fiber attenuation (Zisis)
 
# Requirement of hardware gain matching of pmts for Fcal (and also Bcal)
 
# Requirement of hardware gain matching of pmts for Fcal (and also Bcal)
 +
# Fcal
 +
#* John iterating on support frame. Key load-bearing tubes, currenlty Al, could they switch to iron? Tim needs to weigh in on this one.
 +
#* Need to discuss strategy for fabrication of boards. Paul is concerned primarily about the HV board. We should include Fernando and Chris on the discussion for suggestion of production.
 +
#* Fastrack schedule: Matt asked if Fasttrack has a facility for "resource leveling". Does anyone know?
 +
#* Magnetic shield tests? (Tim needs to provide feedback)
 +
#* Eugene: Fcal activity on calibration is scheduled to start next month. We need to formally address it. Elton suggested creating a more realistic timeline for its implementation. Will discuss with project management and Eugene offline.
 +
# Bcal
 +
#* Web page needs to be setup for communications. A mid-month report is also due. It can be information, but we need to keep consistent records. The site should be password protected.
 +
# Bcal readout
 +
#* Elton to provide information on FM pmt cathode diameters.
 +
#* Slide 8: Matt Suggestion: Plot efficiency vs. a specific angle to understand behavior.
 +
#* Review decision on the orientation of FM pmt relative to Bfield, including tolerances due to expected field changes.
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 14:56, 17 September 2009

Meeting will be dedicated to Calibration and Monitoring

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09

Items for followup from previous meeting(s)

  1. Two components fit for fiber attenuation (Zisis)
  2. Requirement of hardware gain matching of pmts for Fcal (and also Bcal)
  3. Fcal
    • John iterating on support frame. Key load-bearing tubes, currenlty Al, could they switch to iron? Tim needs to weigh in on this one.
    • Need to discuss strategy for fabrication of boards. Paul is concerned primarily about the HV board. We should include Fernando and Chris on the discussion for suggestion of production.
    • Fastrack schedule: Matt asked if Fasttrack has a facility for "resource leveling". Does anyone know?
    • Magnetic shield tests? (Tim needs to provide feedback)
    • Eugene: Fcal activity on calibration is scheduled to start next month. We need to formally address it. Elton suggested creating a more realistic timeline for its implementation. Will discuss with project management and Eugene offline.
  4. Bcal
    • Web page needs to be setup for communications. A mid-month report is also due. It can be information, but we need to keep consistent records. The site should be password protected.
  5. Bcal readout
    • Elton to provide information on FM pmt cathode diameters.
    • Slide 8: Matt Suggestion: Plot efficiency vs. a specific angle to understand behavior.
    • Review decision on the orientation of FM pmt relative to Bfield, including tolerances due to expected field changes.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. Fcal
  5. Bcal
  6. BCAL Readout
  7. Simulation
  8. Other business

Minutes

Attendees: