Difference between revisions of "Oct 13, 2008 Calorimetry"
From GlueXWiki
(→Items for followup from Sep 29 meeting) |
|||
Line 9: | Line 9: | ||
=Items for followup from Sep 29 meeting= | =Items for followup from Sep 29 meeting= | ||
# Mijahlo will show slides for APS meeting at next meeting. | # Mijahlo will show slides for APS meeting at next meeting. | ||
− | # Each subsystem must complete blanks in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Specification Table]]. | + | # Each subsystem must complete blanks in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]]. |
# Decision on Bcal sampling fraction needed if any changes are to be made to design. NEED A DEADLINE | # Decision on Bcal sampling fraction needed if any changes are to be made to design. NEED A DEADLINE | ||
# Resolution studies (Blake) | # Resolution studies (Blake) |
Revision as of 17:24, 10 October 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Sep 29 meeting
- Mijahlo will show slides for APS meeting at next meeting.
- Each subsystem must complete blanks in the Calibration Specification Table.
- Decision on Bcal sampling fraction needed if any changes are to be made to design. NEED A DEADLINE
- Resolution studies (Blake)
- Up-to-date geometry ONGOING.
- Decreased threshold for FM pmts. ONGOING
- Position resolution - understand dependence on granularity.
- Different segmentation for the outer section. - LOWER PRIORITY
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
Documents to Review
Tentative Agenda
- Announcements
- Fcal
- Mihajlo will show slides of his APS presentation on timing
- Bcal
- Roadmap to decision on Bcal readout e-mail
- Fcal
Minutes
Attending: